Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Port Townsend
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Mayodan
Subcontract bids for the following trades. Work may include, but not limited to: wastewater treatment plant, submersible non-clog sewage pump, magnetic flow meters, electrical, concrete work, gravel, hauling, turf, temporary bypass pumping, temporary environmental controls, seeding and restoration, erosion control, demolition, coating and painting, quality control, material testing, influent pump control panel, rock excavation or blasting and removal, videotaping, material testing, temporary utilities, dewatering, compaction of trenches, and backfill along with any incidentals and materials necessary for construction to complete the project.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
Town of Mayodan
Close: Dec 11, 2025
Subcontract bids for the following trades. Work may include, but not limited to: wastewater treatment plant, submersible non-clog sewage pump, magnetic flow meters, electrical, concrete work, gravel, hauling, turf, temporary bypass pumping, temporary environmental controls, seeding and restoration, erosion control, demolition, coating and painting, quality control, material testing, influent pump control panel, rock excavation or blasting and removal, videotaping, material testing, temporary utilities, dewatering, compaction of trenches, and backfill along with any incidentals and materials necessary for construction to complete the project.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Rockingham County
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
Posted Date
Nov 3, 2025
Due Date
Dec 11, 2025
Release: Nov 3, 2025
Rockingham County
Close: Dec 11, 2025
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
AvailableCentral Mainline Sewer Authority
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Central Mainline Sewer Authority
Close: Jan 13, 2026
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
AvailableOrange Co Sanitation District
Seeking engineering services for pump station rehabilitation.
Posted Date
Oct 28, 2025
Due Date
Dec 9, 2025
Release: Oct 28, 2025
Orange Co Sanitation District
Close: Dec 9, 2025
Seeking engineering services for pump station rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →