Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Central Mainline Sewer Authority
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Central Mainline Sewer Authority
Work includes installation of new electrical panels, service and connections for the new rotary press, pump station screening system, and related equipment.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Central Mainline Sewer Authority
Close: Jan 13, 2026
Work includes installation of new electrical panels, service and connections for the new rotary press, pump station screening system, and related equipment.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Port Townsend
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
City of Port Townsend
Close: Dec 18, 2025
This contract includes, but is not limited to, the following work: rehabilitation of the WWTP influent pump station wet well, including surface prep and coating, replacement of pump discharge piping and controls, replacement of influent manhole, bypass pumping, electrical upgrades, odor control ducting and fan replacement, and other work.
AvailableRockingham County
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
Posted Date
Nov 3, 2025
Due Date
Dec 11, 2025
Release: Nov 3, 2025
Rockingham County
Close: Dec 11, 2025
This project consists of the replacement of the existing pumps at the influent pump station. This project will also include coating of the wet well and all pump station piping. Electrical components will also be replaced and include the installation of new variable frequency drives.
AvailableClackamas County
Water Environment Services (WES) is soliciting CM/GC services for the Influent Pump Station Expansion Project at the Tri-City Water Resource Recovery Facility to increase capacity from 47.6 MGD to 72.3 MGD, replacing five pumps and related electrical, controls, and piping and maintaining continuity of operations. The project includes pre-construction services and a construction phase (GMP) over an anticipated ~3-year period; proposals are due Jan 29, 2026.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Clackamas County
Close: Jan 29, 2026
Water Environment Services (WES) is soliciting CM/GC services for the Influent Pump Station Expansion Project at the Tri-City Water Resource Recovery Facility to increase capacity from 47.6 MGD to 72.3 MGD, replacing five pumps and related electrical, controls, and piping and maintaining continuity of operations. The project includes pre-construction services and a construction phase (GMP) over an anticipated ~3-year period; proposals are due Jan 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →