Cherokee Camp & Emergency Services Pavement Rehab (Request For Proposal)
Posted
Sep 2, 2026
Oct 1, 2026
Work includes 5,710 SY of milling, 2,200 SY of heavy asphalt (2" i19. 0c and 1.5" s9.5b), 3,510 SY of 2" s9.5b and pavement markings to match existing; 1,480 SY of light grading, 1,480 SY of 2" s9.5b, and pavement markings for the existing number of parking spaces;receive crack seal, fog seal, and restriping of entire parking lot and drive as shown on the attached map; crack seal on the entire parking lot and driveway as shown on the attached map. Additionally, the back parking lot will receive 600 SY of light grading, 600 SY of 2" s9. 5b, and pavement marking for the existing number of parking spaces.
