Summary
Work under the specifications include the rehabilitation of the metalwork coatings for three (3) spillway radial gates located at the Webster Dam Spillway: External upstream, downstream and edges of gate surfaces, radial arm structural steel members, trunnion assemblies and floatwell covers and frames on the inner piers: removal of existing coating system including handling and disposal; sealing crevasses between structural members; application of new coating system; removal and replacement of bottom and side gate seals. Internal structural steel, skin plates, cover openings surfaces, and gallery: removal of existing coating system including handling and disposal and application of new coating system. Wire Rope and components replacement.