Camden County Municipal Utilities Authority
Special DistrictNJ
Posted
May 21, 2026
Sep 22, 2026
Aeration Tank and Plant Water Upgrades
The project consists of rehabilitations to the aeration tanks and plant water system.
Description: Wastwater Treatment Plant Primary Settling Tank No. 4 Upgrades: The Project consists of the demolition of the existing traveling bridge sludge collector, running, cog and floor rails and surface skimmer, cross collector and scum baffle and supports in Primary Settling. Tank (PST) No. 4, Maintenance of Plant Operations procedures, design, supply and installation of a new traveling bridge sludge collector, rails and scum skimmer, replacement of ancillary equipment including but not limited to scum trough, scum beach, scum baffle, influent baffle, sludge cross collector, railing and grating, miscellaneous tank concrete repairs, associated structural work, electrical and instrumentation.
SpecialDistrict · NJ, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Camden County Municipal Utilities Authority
Special DistrictNJ
Posted
May 21, 2026
Sep 22, 2026
The project consists of rehabilitations to the aeration tanks and plant water system.
Camden County Municipal Utilities Authority
Special DistrictNJ
Posted
May 21, 2026
Sep 22, 2026
The project consists of rehabilitations to the aeration tanks and plant water system.
Indigenous GovernmentNE
Posted
Aug 24, 2026
Oct 1, 2026
Construction of Water Treatment Plant Upgrades on the Winnebago Reservation, Thurston County, Nebraska. The project includes construction of an addition to the existing Winnebago water treatment plant and installation of Owner-provided reverse osmosis treatment equipment, new high service pumps, new chemical feed systems, and associated mechanical, electrical, instrumentation and control and site civil improvements.
CityWA
Posted
-
Sep 16, 2026
Installation of a new micro strainer, new return weir modifications, and appurtenances to facilitate the treatment plant improvements includes 1 LS clearing and grubbing, 1 LS trench excavation safety system, 1 LS construction stormwater management, 1 LS micro strainer with weatherproofing package, 1 LS adjustable weir modifications, 2 EA watermain valve replacement.