Aeration Tank and Plant Water Upgrades
The project consists of rehabilitations to the aeration tanks and plant water system.
Description: The project consists of rehabilitations to the aeration tanks and plant water system.
SpecialDistrict · NJ, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Camden County Municipal Utilities Authority
Special DistrictNJ
May 21, 2026
Closes
Sep 9, 2026
The project consists of rehabilitations to the aeration tanks and plant water system.
CityWA
-
Closes
Sep 16, 2026
The City of Harrington is soliciting sealed bids for upgrades to its wastewater treatment plant. The work includes installing a new micro strainer, modifying the return weir, and providing the labor, equipment, transportation, supervision, materials, and incidentals needed to complete the improvements. The estimated project cost is $1,000,000 - $1,200,000, and the project is partially funded through the Washington State Community Development Block Grant program with federal funds from the U.S. Department of Housing and Urban Development.
CityGA
Aug 10, 2026
Closes
Sep 17, 2026
The City of Social Circle, Georgia is seeking contractors for significant upgrades to its Little River Water Pollution Control Plant and sewerage system. Contract 1 covers approximately 3,600 linear feet of DIP and PVC sewer with manholes, jack-and-bore work, rock excavation, clearing, and erosion and sediment controls, while Contract 2 covers new treatment-process and support facilities including aeration basins, clarifiers, tertiary filters, ultraviolet disinfection, pumping, chemical feed, control, digestion, and sludge-dewatering facilities. The Georgia Procurement Registry identifies this as a construction/public-works procurement rather than a grant, requiring a State of Georgia Utility Contractor License and a state Utility Manager certificate holder, with listed completion periods of 270, 480, and 540 days.
Massachusetts Water Resources Authority
Special DistrictMA
Jun 24, 2026
Closes
Sep 9, 2026
The work includes, but is not limited to, upgrades to the Carbon Dioxide Systems, including the removal and disposal of four vaporizers, associated control panels, CO2 piping, accessories, concrete pads and curbing and the installation of two new vaporizers, control panels, CO2 piping and accessories on a new concrete pad. Sub-trades: Painting & Electrical Work.