Closing soonWastewater Treatment Plant Bar Screen Replacement Improvements RFP
Description: Project include the replacement of the combined overflow pumping station’s two (2) influent screens equipment, including the demolition of the existing two (2) influent screens and buildings, installation of two (2) new influent bar screens, connected monorail with motorized and hydraulic bar screen rake over dumpster loading area, new reinforced concrete dumpster loading area, new pre-engineered metal canopy, water line with accompanying yard hydrants addition to existing plant water lines, replacement of the two (2) pumping station upstream diversion structures electrically-actuated slide gates, cleaning of the two (2) connecting sewer lines from diversion structures to pumping station, and other miscellaneous demolition, civil, structural, piping, electrical, instrumentation and controls, mechanical, and site grading improvements.