CityPA
Posted
Sep 10, 2026
Sep 30, 2026
Wastewater Treatment Plant Driveway Improvements RFP
Project involves asphalt milling, installation of asphalt paving, and appurtenant work at 5 different sites within Township.
Description: Beaver Brook Wastewater Treatment Plant Digester Cleaning and Improvements: Digester Improvements - Complete, Allowance for Immediate Repairs, Disposal of Additional WWTP Cake - 30 CY.
City · CT, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityPA
Posted
Sep 10, 2026
Sep 30, 2026
Project involves asphalt milling, installation of asphalt paving, and appurtenant work at 5 different sites within Township.
CityTN
Posted
Aug 25, 2026
Sep 24, 2026
The Project consists of the following major elements: new influent equalization basin and associated piping, new equalization feed pump, return pump and associated force mains, and new UV Treatment equipment at the Greenbrier Wastewater Treatment Plant, including electrical work and modifications for a complete project.
CityOR
Posted
Aug 19, 2026
Oct 7, 2026
Procurement of professional engineering design services for the City of Sandy's Wastewater Treatment Plant Improvements, including the retrofit to a membrane bioreactor (MBR) facility and upgrades to headworks, aeration basins, and solids handling processes.
Atwood Regional Water And Sewer District
Special DistrictOH
Posted
Aug 21, 2026
Oct 28, 2026
Division 1 base bid: encompass work within the wastewater treatment plant including replacement of process equipment (splitter box, blowers, air piping, diffusors, clarifier equipment and digester air system) a new generator, electrical upgrades, installation of gravity sewer piping, and construction of a new building to house the blowers and electrical components. Alternate 1: includes all labor, material, equipment, and appurtenances to provide and install mechanical screen location and appurtenances in the headworks building as shown on the plans and as stated in the specifications. Includes all concrete work associated with channel relocation, electrical improvements and mechanical screen location. Alternate 2: includes all associated labor, material, equipment, and appurtenances to provide and install all blowers, diffusers, and accessories for the project as shown on the plans and as stated in the specifications. Division 2 base bid: includes construction of the new administration building, new water supply well, grinder pump station and electrical installation. Alternate 1: includes removal and replacement of concrete floors and drive approach to an existing storage building.
Decision makers connected to this RFP from City of Milford.