Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 68 LF 6" water pipe and fittings; 2,940 LF 12" water pipe and fittings; 10 EA 6" valve and appurtenances; 32 LF 24" casing pipe; 10 EA fire hydrant, type iii; 44 LF saw cut pavement; 21 LF existing 12" waterline remove and dispose of; 17. 900 SY asphalt pavement replacement; 10 EA manhole, standard type a; 3,330 LF 18" dia. Sanitary sewer pipe w/type i bedding (sdr 26); 51 SY gravel driveway repair; 50 CY rock excavation allowance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase 2 includes approxmn 1,350 LF of a two lane undivided roadway section. The project includes earthwork, storm sewer, water main, roadway paving, sidewalk ramps, signing, pavement marking, traffic control, ditch grading, erosion control, and final surface restoration.
Posted Date
Jan 14, 2026
Due Date
Feb 10, 2026
Release: Jan 14, 2026
Close: Feb 10, 2026
Phase 2 includes approxmn 1,350 LF of a two lane undivided roadway section. The project includes earthwork, storm sewer, water main, roadway paving, sidewalk ramps, signing, pavement marking, traffic control, ditch grading, erosion control, and final surface restoration.
AvailableReconstruction and new construction of roughly 1,400 LF of 2-lane urban roadway, including bike lanes, curb and gutter, and sidewalk; with associated water and storm sewer utility extensions/connections. Work will also include construction of an off-street parking lot.
Posted Date
Jan 20, 2026
Due Date
Mar 4, 2026
Release: Jan 20, 2026
Close: Mar 4, 2026
Reconstruction and new construction of roughly 1,400 LF of 2-lane urban roadway, including bike lanes, curb and gutter, and sidewalk; with associated water and storm sewer utility extensions/connections. Work will also include construction of an off-street parking lot.
AvailableThe City of Ormond Beach is soliciting sealed bids for the A1A Utility Relocations Phase 2 project from Roberta Road to the Flagler County line. The work includes installation and removal of water mains, force mains, fire hydrants, and a water standpipe across multiple locations along A1A with specified linear footage. Bid documents (plans and project manual) are available via DemandStar; a pre-bid and bid opening are scheduled per the city's calendar and the legal advertisement.
Posted Date
Jan 25, 2026
Due Date
Feb 25, 2026
Release: Jan 25, 2026
Close: Feb 25, 2026
The City of Ormond Beach is soliciting sealed bids for the A1A Utility Relocations Phase 2 project from Roberta Road to the Flagler County line. The work includes installation and removal of water mains, force mains, fire hydrants, and a water standpipe across multiple locations along A1A with specified linear footage. Bid documents (plans and project manual) are available via DemandStar; a pre-bid and bid opening are scheduled per the city's calendar and the legal advertisement.
Provide bike and pedestrian corridor improvements. Work will include lighting, storm drain, landscape, traffic signal improvements, potential pavement preservation, and other roadway safety measures. Asphalt concrete pavement milling (1" depth) 10,395. 00 sq yd, asphalt concrete pavement milling (2" depth) 1,349. 00 sq yd, subgrade preparation 4,844. 00 sq yd, aggregate base course 753 cu yd, asphalt concrete surface course, type d 1/2 1,751. 00 ton, asphalt concrete surface course, type c 3/4, 3" thick 646 ton, portland cement concrete pavement, class a, 9" thick 1,036. 00 sq yd, emulsified asphalt for tack coat, type ss-1h 24 ton. See outside link or attached files.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Provide bike and pedestrian corridor improvements. Work will include lighting, storm drain, landscape, traffic signal improvements, potential pavement preservation, and other roadway safety measures. Asphalt concrete pavement milling (1" depth) 10,395. 00 sq yd, asphalt concrete pavement milling (2" depth) 1,349. 00 sq yd, subgrade preparation 4,844. 00 sq yd, aggregate base course 753 cu yd, asphalt concrete surface course, type d 1/2 1,751. 00 ton, asphalt concrete surface course, type c 3/4, 3" thick 646 ton, portland cement concrete pavement, class a, 9" thick 1,036. 00 sq yd, emulsified asphalt for tack coat, type ss-1h 24 ton. See outside link or attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.