Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Sole Source: Deprioritize; no evidence it’s accepted—plan for a full competitive bid.
Coops: For future efficiency, ask about Wisconsin DOA Cooperative Purchasing (VendorNet), Statewide Contracts via VendorNet, Sourcewell, OMNIA Partners.
Village of Lake Delton, WI: No evidence of sole source awards; process appears rigid. Practical guidance:
Deprioritize sole source; expect formal competitive bidding.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Village of Lake Delton's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Village Engineer
Administrator-Clerk-Treasurer
Treasurer-Office Manager-Deputy Clerk
Zoning Administrator/Building Inspector
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Village of Lake Delton
Reconstruction and new construction of roughly 1,400 LF of 2-lane urban roadway, including bike lanes, curb and gutter, and sidewalk; with associated water and storm sewer utility extensions/connections. Work will also include construction of an off-street parking lot.
Posted Date
Jan 20, 2026
Due Date
Mar 4, 2026
Release: Jan 20, 2026
Village of Lake Delton
Close: Mar 4, 2026
Reconstruction and new construction of roughly 1,400 LF of 2-lane urban roadway, including bike lanes, curb and gutter, and sidewalk; with associated water and storm sewer utility extensions/connections. Work will also include construction of an off-street parking lot.
AvailableVillage of Lake Delton
The Project includes approx. the replacement of existing US Pipe Hydrants with Waterous Hydrants within the Village. Work shall include all associated mobilization, traffic control, erosion control, and site restoration work necessary to replace the hydrants included within the 2026 Hydrant Replacement Program. See outside link for more details.
Posted Date
Jan 5, 2026
Due Date
Feb 5, 2026
Release: Jan 5, 2026
Village of Lake Delton
Close: Feb 5, 2026
The Project includes approx. the replacement of existing US Pipe Hydrants with Waterous Hydrants within the Village. Work shall include all associated mobilization, traffic control, erosion control, and site restoration work necessary to replace the hydrants included within the 2026 Hydrant Replacement Program. See outside link for more details.
AvailableVillage of Lake Delton
The project includes construction, test pumping, sampling and laboratory testing of two bedrock test wells.
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
Village of Lake Delton
Close: Dec 22, 2025
The project includes construction, test pumping, sampling and laboratory testing of two bedrock test wells.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.