CityWI
Posted
Nov 13, 2026
Dec 17, 2026
Village of Lake Delton - Municipal Wellhouse 8 RFP
Construction of municipal wellhouse #8 and final well #8. The wellhouse facility will generally include construction of a masonry wellhouse structure, including the furnishing and installing of a vertical turbine well pump and motor, natural gas generator set, chemical feed systems, process piping and valves, mechanical, electrical, instrumentation and control system integration, underground water and sanitary sewer utilities, asphalt paving and all related site restoration. The final well generally includes construction of a rock-walled, potable water well and associated test pumping and water quality sampling.
