Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase 2 includes approxmn 1,350 LF of a two lane undivided roadway section. The project includes earthwork, storm sewer, water main, roadway paving, sidewalk ramps, signing, pavement marking, traffic control, ditch grading, erosion control, and final surface restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of labor, materials, and equipment for the Sherry Drive Water Main Extension Phase II project, involving the furnishing and installation of approximately 3,887 linear feet of various diameter PVC water main using horizontal directional drilling and direct bury methods, including all associated pipes, fittings, valves, and appurtenances.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Procurement of labor, materials, and equipment for the Sherry Drive Water Main Extension Phase II project, involving the furnishing and installation of approximately 3,887 linear feet of various diameter PVC water main using horizontal directional drilling and direct bury methods, including all associated pipes, fittings, valves, and appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of extending road. The project consists of 9" concrete pavement (approximately 5,700 SY), sidewalks (approximately 1800 SY), installing approximately 1,250 LF of 8" water line, approximately 1,910 LF of 8" sanitary sewer line and 815 LF of 18"-36" storm drain line and all associated appurtenances.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Project generally consists of extending road. The project consists of 9" concrete pavement (approximately 5,700 SY), sidewalks (approximately 1800 SY), installing approximately 1,250 LF of 8" water line, approximately 1,910 LF of 8" sanitary sewer line and 815 LF of 18"-36" storm drain line and all associated appurtenances.
AvailableThe work consists of furnishing all labor, materials and equipment necessary to complete the following Base Bid: Furnish and install approximately 1388 LF of 12” DR18 FPVC water main by Horizontal Directional Drilling, approximately 1500 LF of 12” DR-18 PVC water main, approximately 987 LF of 8” DR-18 PVC water main and 12 LF of 6” DR-18 PVC water main by direct bury. The work shall include all pipe, fittings, valves, and appurtenances. See attached file for full scope.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
The work consists of furnishing all labor, materials and equipment necessary to complete the following Base Bid: Furnish and install approximately 1388 LF of 12” DR18 FPVC water main by Horizontal Directional Drilling, approximately 1500 LF of 12” DR-18 PVC water main, approximately 987 LF of 8” DR-18 PVC water main and 12 LF of 6” DR-18 PVC water main by direct bury. The work shall include all pipe, fittings, valves, and appurtenances. See attached file for full scope.
AvailableDrive extension. Improve accessibility for pedestrian, bicycle, and vehicular connections to the drive light rail station as well as promote economic development by providing infrastructure to support and encourage transit supportive development. Complete street that includes upgraded pedestrian and bicycle facilities. This project will provide upgraded sidewalks, bike lanes, planting strips, pedestrian lighting, and street trees to achieve usdg guidelines. Work includes construction of concrete sidewalk, curb and gutter, paving, grading, drainage, retaining walls, culverts, erosion control, and utilities. See outside link.
Posted Date
Nov 26, 2025
Due Date
Jan 30, 2026
Release: Nov 26, 2025
Close: Jan 30, 2026
Drive extension. Improve accessibility for pedestrian, bicycle, and vehicular connections to the drive light rail station as well as promote economic development by providing infrastructure to support and encourage transit supportive development. Complete street that includes upgraded pedestrian and bicycle facilities. This project will provide upgraded sidewalks, bike lanes, planting strips, pedestrian lighting, and street trees to achieve usdg guidelines. Work includes construction of concrete sidewalk, curb and gutter, paving, grading, drainage, retaining walls, culverts, erosion control, and utilities. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.