Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Reconstruction and new construction of roughly 1,400 LF of 2-lane urban roadway, including bike lanes, curb and gutter, and sidewalk; with associated water and storm sewer utility extensions/connections. Work will also include construction of an off-street parking lot.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Close: Feb 5, 2026
Local street improvement program - phase 2.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes approx. the replacement of existing US Pipe Hydrants with Waterous Hydrants within the Village. Work shall include all associated mobilization, traffic control, erosion control, and site restoration work necessary to replace the hydrants included within the 2026 Hydrant Replacement Program. See outside link for more details.
Posted Date
Jan 5, 2026
Due Date
Feb 5, 2026
Release: Jan 5, 2026
Close: Feb 5, 2026
The Project includes approx. the replacement of existing US Pipe Hydrants with Waterous Hydrants within the Village. Work shall include all associated mobilization, traffic control, erosion control, and site restoration work necessary to replace the hydrants included within the 2026 Hydrant Replacement Program. See outside link for more details.
AvailablePhase 2 includes approxmn 1,350 LF of a two lane undivided roadway section. The project includes earthwork, storm sewer, water main, roadway paving, sidewalk ramps, signing, pavement marking, traffic control, ditch grading, erosion control, and final surface restoration.
Posted Date
Jan 14, 2026
Due Date
Feb 10, 2026
Release: Jan 14, 2026
Close: Feb 10, 2026
Phase 2 includes approxmn 1,350 LF of a two lane undivided roadway section. The project includes earthwork, storm sewer, water main, roadway paving, sidewalk ramps, signing, pavement marking, traffic control, ditch grading, erosion control, and final surface restoration.
AvailableThe City of Lake Mills is soliciting bids for full reconstruction and utility work on East Prospect Street, Maas Street, and Mulberry Street, including water main, sanitary and storm sewer installation, and asphalt paving. The project involves comprehensive infrastructure upgrades such as new curb and gutter, concrete driveway aprons, and spot replacement of sidewalks. Bids were officially posted in late January 2026 with a scheduled bid opening in mid-February 2026.
Posted Date
Jan 29, 2026
Due Date
Feb 12, 2026
Release: Jan 29, 2026
Close: Feb 12, 2026
The City of Lake Mills is soliciting bids for full reconstruction and utility work on East Prospect Street, Maas Street, and Mulberry Street, including water main, sanitary and storm sewer installation, and asphalt paving. The project involves comprehensive infrastructure upgrades such as new curb and gutter, concrete driveway aprons, and spot replacement of sidewalks. Bids were officially posted in late January 2026 with a scheduled bid opening in mid-February 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →