Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Clayton, North Carolina is requesting sealed bids for the Walmart Pump Station Abandonment & Gravity Sewer Extension project (Bid #700-ENG-2026-05). Bids will be received at Town Hall until Thursday, February 12, 2026 at 2:00 PM local time; the description notes this is a construction project and references DWI Project # SRP‑W‑134‑0119. Full advertisement, plans, and specifications are available to registered plan holders via the Town’s bidding portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 50 CY undercut excavation and additional stone; 1 LS erosion and sediment control; 20 LF remove and replace concrete curb and gutter, complete-in-place; 163 LF remove and replace concrete valley gutter, complete-in-place; 97 SY remove and replace residential driveway, complete-in-place; 381 SY remove and replace commercial driveway, complete-in-place; 432 SY stone shoulder restoration, complete-in-place; 304 SY asphalt roadway pavement restoration, complete-in-place; 16 EA 4" sdr-26 PVC lateral; 2 EA 6" sdr-26 PVC lateral; 4 EA furnish and install new sanitary manhole. See attached file.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Work includes 50 CY undercut excavation and additional stone; 1 LS erosion and sediment control; 20 LF remove and replace concrete curb and gutter, complete-in-place; 163 LF remove and replace concrete valley gutter, complete-in-place; 97 SY remove and replace residential driveway, complete-in-place; 381 SY remove and replace commercial driveway, complete-in-place; 432 SY stone shoulder restoration, complete-in-place; 304 SY asphalt roadway pavement restoration, complete-in-place; 16 EA 4" sdr-26 PVC lateral; 2 EA 6" sdr-26 PVC lateral; 4 EA furnish and install new sanitary manhole. See attached file.
AvailableProject consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Project consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
AvailableThe Town of Winthrop, Massachusetts is soliciting bids to repair and upgrade the Winthrop Street Sewer Pump Station. Work includes removal of existing equipment and installation of new submersible grinder pumps with associated bases, guide rails, check valves, and discharge piping. The solicitation seeks qualified contractors to perform the improvements and deliver reliable sewer pump station operations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
The Town of Winthrop, Massachusetts is soliciting bids to repair and upgrade the Winthrop Street Sewer Pump Station. Work includes removal of existing equipment and installation of new submersible grinder pumps with associated bases, guide rails, check valves, and discharge piping. The solicitation seeks qualified contractors to perform the improvements and deliver reliable sewer pump station operations.
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis