Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 50 CY undercut excavation and additional stone; 1 LS erosion and sediment control; 20 LF remove and replace concrete curb and gutter, complete-in-place; 163 LF remove and replace concrete valley gutter, complete-in-place; 97 SY remove and replace residential driveway, complete-in-place; 381 SY remove and replace commercial driveway, complete-in-place; 432 SY stone shoulder restoration, complete-in-place; 304 SY asphalt roadway pavement restoration, complete-in-place; 16 EA 4" sdr-26 PVC lateral; 2 EA 6" sdr-26 PVC lateral; 4 EA furnish and install new sanitary manhole. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Clayton, North Carolina is requesting sealed bids for the Walmart Pump Station Abandonment & Gravity Sewer Extension project (Bid #700-ENG-2026-05). Bids will be received at Town Hall until Thursday, February 12, 2026 at 2:00 PM local time; the description notes this is a construction project and references DWI Project # SRP‑W‑134‑0119. Full advertisement, plans, and specifications are available to registered plan holders via the Town’s bidding portal.
Posted Date
Jan 6, 2026
Due Date
Feb 12, 2026
Release: Jan 6, 2026
Close: Feb 12, 2026
The Town of Clayton, North Carolina is requesting sealed bids for the Walmart Pump Station Abandonment & Gravity Sewer Extension project (Bid #700-ENG-2026-05). Bids will be received at Town Hall until Thursday, February 12, 2026 at 2:00 PM local time; the description notes this is a construction project and references DWI Project # SRP‑W‑134‑0119. Full advertisement, plans, and specifications are available to registered plan holders via the Town’s bidding portal.
AvailableThis RFP is for the rehabilitation of a gravity sewer main, including pressure grouting and CIPP lining of approximately 335 linear feet of 12-inch DIP gravity sewer main, and the rehabilitation of two existing sanitary sewer manholes.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
This RFP is for the rehabilitation of a gravity sewer main, including pressure grouting and CIPP lining of approximately 335 linear feet of 12-inch DIP gravity sewer main, and the rehabilitation of two existing sanitary sewer manholes.
AvailableWork include CCTV inspection of gravity sewer pipelines and manholes, with inspection data used to develop scopes of work for rehabilitation by specialized contractors.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
Work include CCTV inspection of gravity sewer pipelines and manholes, with inspection data used to develop scopes of work for rehabilitation by specialized contractors.
AvailableThe furnishing, installing, and testing of a new 10.0 million gallon equalization basin, flow diversion structure, wastewater pumping station, odor control system, gravity sewer piping, force main piping, handling wastewater flows for tie-in to existing gravity sewers and sewer manholes, site work, and all other work as shown on the construction drawings.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
The furnishing, installing, and testing of a new 10.0 million gallon equalization basin, flow diversion structure, wastewater pumping station, odor control system, gravity sewer piping, force main piping, handling wastewater flows for tie-in to existing gravity sewers and sewer manholes, site work, and all other work as shown on the construction drawings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis