Special DistrictFL
Jul 29, 2026
Closes
Aug 20, 2026
VPS #5 Group K Septic To Sewer Project
Work inlcudes installation of 4" diameter PVC sewer laterals, the decommissioning of the onsite residential septic tanks, connecting into the existing sewer lateral located at the right-of-way of each residence and restoration of the work area.