Special DistrictFL
Jul 29, 2026
Closes
Aug 20, 2026
VPS #5 Group L Septic To Sewer Project
Work inlcudes installation of 4-inch diameter PVC sewer laterals, the decommissioning of the onsite residential septic tanks, connecting into the existing sewer lateral located at the right-of-way of each residence and restoration of the work area.