Retrieving RFP details
Release
Close
Village of Rantoul
General construction of upgrading four of the west sand filters at the Water Treatment Plant. This includes replacement of the underdrain and media retainers, replacement of the media with sand and anthracite, and replacement of the surface wash system agitators and piping.
City of Ardmore
Provide water treatment plant filter rehab. The project consisting of restoring operations to one or more filters at the city water treatment plant by removing the existing filter media, replacing the underdrain system, placing new media, testing, disinfecting and re storing system to full operation.
Village of Barrington
Project consist of Iron Filter Replacement in Water Treatment Plant; see outside links for more details.
Village of Mount Kisco
Work consists of all HVAC work at the Water Treatment Plant and the HVAC work for the Memorial Pool Upgrades.
Jackson Township Fire District 4
Project consist of approx 32 EA of 16" DIP flanges in filter gallery 304SS, nuts/bolts; replacement of flange bolts/nuts, recoating of floors, replacement of 7 EA pipe stands and base plates, recoating all pipe stands and base plates, recoating of all piping in the filter room excluding “raw water piping”, and minor ceiling repairs and repainting.
Release
Oct 01, 2024
Close
Oct 24, 2024