Summary
construction shall include areas of pulverizing, balancing, grading and repaving of existing bituminous road ways totaling approx. 2400 SY; removal of excess pulverized material totaling approx. 200 CY; fine grading and subbase preparation; replacement of bituminous leveling course and wearing course totaling approx. 565 TN; removal and replacement of existing driveway and road culverts; minor road ditching; limited concrete curb & gutter and sidewalk installation; signing and traffic control; cleanup and restoration and other miscellaneous work items that normally are included with the described work items.