Summary
The base work of this project consists generally of: without limitation, notification of residents; traffic control; installation of best management practices for storm water management; roadway grinding and paving; removal of existing sidewalk, curb & gutter, and curb ramps and replacement with new curb ramps and sidewalks; asphalt concrete spot reconstruction/dig outs; resurfacing City streets with Microsurfacing; adjustment of utility lids to the new grade; removal of sign posts and signs & installation of new sign posts and signs; installation of new roadway markings and striping; installation of Rectangular Rapid Flashing Beacons (RRFB), and site cleanup. A Bid Alt Construction element in the Downtown - Broadway Ped Mall includes similar work. Contract Documents fully describe the Work.