Closing soon

US 222 Widening RFP

Description: 4.5 miles of reconstruction and widening of roadway work (providing for two twelve-foot lanes, one ten-foot outside shoulder and one 4-foot inside shoulder in each direction). Also included is a center median barrier, a bridge replacement, roundabouts at Richmond Rd and Pleasant Hill Rd and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 222, SECTION 28M, in BERKS COUNTY, RICHMOND AND MAIDENCREEK TOWNSHIP from approximately Shaeffer Road at segment 0440 offset 0303 to approximately the Kutztown Bypass at segment 0530 offset 1478. County: Berks Municipality: MAIDEN CREEK District: 05 SR: 222 Section: 28M State Type of Work: WIDENING (ADDITIONAL LANES) Project Cost Range: $80,000,000.00 - $89,999,999.99 Federal Project Status: PENNDOT Oversight NHS

Released
Sep 22, 2026
Closes
Dec 3, 2026(11 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts