Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Pennsylvania Department of Transportation
Mobile desktop driving simulator with monitor equipped with impaired distracted software.
Posted Date
Jun 2, 2026
Due Date
Jun 16, 2026
Release: Jun 2, 2026
Pennsylvania Department of Transportation
Close: Jun 16, 2026
Mobile desktop driving simulator with monitor equipped with impaired distracted software.
AvailablePennsylvania Department of Transportation
Mobile desktop driving simulator with monitor equipped with impaired distracted software.
Posted Date
Jun 2, 2026
Due Date
Jun 16, 2026
Release: Jun 2, 2026
Pennsylvania Department of Transportation
Close: Jun 16, 2026
Mobile desktop driving simulator with monitor equipped with impaired distracted software.
AvailablePennsylvania Department of Transportation
Structure improvements to (3) locally owned structures.
Posted Date
May 16, 2026
Due Date
Jun 18, 2026
Release: May 16, 2026
Pennsylvania Department of Transportation
Close: Jun 18, 2026
Structure improvements to (3) locally owned structures.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Pennsylvania Department of Transportation
This is a Project Specific Agreement E06300 between the Commonwealth of Pennsylvania, Department of Transportation (PennDOT), and PRIME AE Group, Inc. for the Clinton County Local Bridge Replacement Project (SIR 7215-LOC (T-349)). The agreement, made on January 8, 2026, covers Preliminary Engineering, Final Design, and Construction Consultation for the SR 7215 Section LOC bridge replacement over Fishing Creek. The total maximum cost for the agreement is $799,171.93, with services for each part commencing upon issuance of a Notice to Proceed and having durations of 12, 18, and 12 months respectively.
Effective Date
Jan 8, 2026
Expires
Effective: Jan 8, 2026
Pennsylvania Department of Transportation
Expires:
This is a Project Specific Agreement E06300 between the Commonwealth of Pennsylvania, Department of Transportation (PennDOT), and PRIME AE Group, Inc. for the Clinton County Local Bridge Replacement Project (SIR 7215-LOC (T-349)). The agreement, made on January 8, 2026, covers Preliminary Engineering, Final Design, and Construction Consultation for the SR 7215 Section LOC bridge replacement over Fishing Creek. The total maximum cost for the agreement is $799,171.93, with services for each part commencing upon issuance of a Notice to Proceed and having durations of 12, 18, and 12 months respectively.
AvailablePennsylvania Department of Transportation
This agreement, E06285, is for precast and prestressed concrete plant inspection and related services on a statewide basis, between the Commonwealth of Pennsylvania, Department of Transportation, and KTA-Tator, Inc. The total maximum cost of the agreement is $21,645,022.66. The work is divided into two parts, each to be completed within 60 calendar months after the Notice To Proceed date. The agreement was made and entered into on January 5, 2026, and includes various terms, conditions, and provisions for compliance and compensation.
Effective Date
Jan 5, 2026
Expires
Effective: Jan 5, 2026
Pennsylvania Department of Transportation
Expires:
This agreement, E06285, is for precast and prestressed concrete plant inspection and related services on a statewide basis, between the Commonwealth of Pennsylvania, Department of Transportation, and KTA-Tator, Inc. The total maximum cost of the agreement is $21,645,022.66. The work is divided into two parts, each to be completed within 60 calendar months after the Notice To Proceed date. The agreement was made and entered into on January 5, 2026, and includes various terms, conditions, and provisions for compliance and compensation.
AvailablePennsylvania Department of Transportation
This agreement outlines the terms between the Commonwealth of Pennsylvania, Department of Transportation, and TRC Engineers, Inc. for precast and prestressed concrete plant inspection and related services statewide. The total maximum cost for the agreement is $21,349,449.18, encompassing two parts: Construction Inspection and Construction Support Services. The agreement was entered into on January 5, 2026, with work to be completed within 60 calendar months after the Notice to Proceed date. T&Cs are provided.
Effective Date
Jan 5, 2026
Expires
Effective: Jan 5, 2026
Pennsylvania Department of Transportation
Expires:
This agreement outlines the terms between the Commonwealth of Pennsylvania, Department of Transportation, and TRC Engineers, Inc. for precast and prestressed concrete plant inspection and related services statewide. The total maximum cost for the agreement is $21,349,449.18, encompassing two parts: Construction Inspection and Construction Support Services. The agreement was entered into on January 5, 2026, with work to be completed within 60 calendar months after the Notice to Proceed date. T&Cs are provided.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Pennsylvania Department of Transportation
The public meeting focused on the Route 663 and Allentown Road improvement project in Milford Township. Key topics included an overview of the roadway reconstruction, the addition of left-turn lanes, the installation of new signal phasing, and the replacement of bridges over the Unami and Licking Creeks to improve hydraulic capacity and mitigate historical flooding. The presentation detailed a four-stage construction schedule, anticipated traffic detours, and utility relocation plans, alongside efforts to incorporate storm water management facilities and restore local riparian buffers.
The meeting provided a detailed update on the Commercial Street Bridge replacement project. Key discussion topics included the planned 25-day closure of the I-376 Parkway East to facilitate the demolition of the old bridge and the lateral sliding of the new structure into place. The presentation covered the construction timeline, the innovative bridge-sliding method, maintenance work planned for the Squirrel Hill Tunnels, and comprehensive detour routes for both motorists and cyclists to mitigate traffic impacts during the closure.
This document outlines the Historic Metal Truss Bridge Capital Rehabilitation Program, a ten-year initiative by the Pennsylvania Department of Transportation. Its primary purpose is to promote the rehabilitation of historic metal truss bridges for continued vehicular use, with a secondary focus on supporting their adaptive re-use. Key priorities include strategic funding allocation for eligible bridges, selection based on criteria such as condition and public benefit, and multi-agency collaboration for project management and delivery, aiming to extend the useful life of these historic assets.
The 2024 Pennsylvania National Electric Vehicle Infrastructure (NEVI) Plan outlines the Commonwealth's approach to planning, deploying, and administering federal funding for electric vehicle charging infrastructure. It focuses on establishing a convenient, reliable, affordable, safe, and equitable EV charging network through key programs such as Corridor Connections, Community Charging, Critical Investments, and EV Workforce development. The plan aims to achieve 125 MW of charging capacity and 5,000 person-hours of workforce training to support EV adoption and economic growth across Pennsylvania.
The public meeting provided an overview of the Washington Lane Corridor Safety Improvement Project. Key topics included the project selection criteria, existing corridor conditions, and proposed safety measures such as curb bump-outs, signal upgrades, pedestrian countdown timers, pavement markings, and a rectangular rapid flashing beacon at the Briar Road mid-block crossing. The project team also discussed the anticipated impact on parking spaces and coordinate with SEPTA regarding bus stop locations and bus operations along the corridor.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Pennsylvania Department of Transportation's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant District Executive – Maintenance, District 8 (PennDOT)
Business Analysis & Process Improvement Division Manager, Infrastructure & Economic Development (I&ED) IT Delivery Center
Premium
Access the largest public sector contact database
© 2026 Starbridge