CityCA
Posted
-
Nov 19, 2026
Storm Drain Inlet Insert Installation RFP
Furnish and Install Connector Pipe Screen (CPS) Repair Catch Basin Damage (Allowance) Photographic Documentation of Work Cleanout Existing Catch Basin
Description: Project consists of widening the existing roadway by constructing new asphalt concrete pavement. Additional work includes constructing curb and gutter and sidewalk, reconstructing curb ramp returns, and driveways, relocating property wall, constructing storm drain, relocating water facilities, installing street lighting, pavement marking, signing, seeding, and other miscellaneous work.
StateAgency · AZ, US
Adjacent opportunities open for bidding right now.
CityCA
Posted
-
Nov 19, 2026
Furnish and Install Connector Pipe Screen (CPS) Repair Catch Basin Damage (Allowance) Photographic Documentation of Work Cleanout Existing Catch Basin
CityOK
Posted
Oct 28, 2026
Nov 25, 2026
Work includes approx 443 LF of 18" RCP storm sewer "O" ring; 284 LF of 24" RCP storm sewer "O" ring; 56 LF of 60" RCP storm sewer "O" ring; 67 LF of 18" HP storm sewer; 1,263 LF of 24" HP storm sewer; 73 LF of 12" PVC waterline pipe restrained joint DR-14 with 12 gauge copper tracer wire; 240 3" rigid plastic conduit (trenched); 3,080 LF of 5" conductor traffic signal electrical cable.
CityAL
Posted
Oct 24, 2026
Nov 30, 2026
Work includes 13147 SY of ituminous treatment - g; 106 SY of remove existing driveway (concrete, gravel, asphalt; 1193 ton of superpave bituminous concrete wearing surface layer, 3/4" maximum aggregate size mix, esal, range a/b (approx. 165 lb/sy; silt fenc silt fenc. , solid yellow, class 2, type a traffic stripe (4" centerline), 72 SF of emporary traffic control markings (paint.
CityAZ
Posted
-
Dec 18, 2026
Decision makers connected to this RFP from Arizona Department of Transportation.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
Maricopa Mayor Nancy Smith reported that the Maricopa City Council unanimously approved a half-cent sales-tax increase for widening SR 347 and that the city had signed an IGA with ADOT.
We'll move now to um Maricopa Mayor Nancy Smith. Hello and good morning, Madame Chair and members of the board. Thank you for giving me the opportunity to speak here today. I did provide you this wonderful little picture. I have a story behind this picture and the top of it says out of the mouth of babes. So, you've heard me and many other adults talk about…
Arizona State Transportation Board Audio Recording
Board meeting · May 16, 2025
Board meeting
ADOT proposed programming the Pinal County SR 347 widening, subject to the city and county $50 million commitment, with design in FY2026 and construction planned across FY2027-2029.
This is a brief summary of the projects currently proposed for state rout 347. The discussion today relates to the widening project and funding for the portion that lies within Canal County. This slide shows some assumptions that we made to develop this scenario. First, the current estimate for county section is 136.33 million. We are not including the…
Board meeting
Board Member Howard requested a fiscal and year-by-year schedule analysis of moving SR 347 forward in the five-year program.
Um, with regards to the June meeting, I'd like to possibly request some information um, as part of our meeting and the consideration of the 5-year program and approval. Um I know we've had several presentations from staff on the 347 um both uh funding uh shortfalls um and if at all possible could they present a summary again maybe combining some of these…
Arizona State Transportation Board Board Meeting
Board meeting · Jun 5, 2025
Board meeting
The State Transportation Board approved the FY26-38 five-year transportation facilities construction program including alternative 3.
don't mind. Um, Madam Chair, I move that we approve the FY26 through 38 5-year transportation facilities construction program, including the addition of alternative three as presented. Good. Sounds great. All right, we have a motion by board member Howard. Is there a second? I'll second it. We have three seconds. So, you can pick what you want. Thank you…
Arizona State Transportation Board Audio Recording
Board meeting · Jun 20, 2025
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (67 days left)
Arizona State Transportation Board Audio Recording
Board meeting · May 16, 2025