Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a vendor for the follow-on steam and condensate line replacement/construction in the heart of URI's campus. The project includes replacing several hundred yards of high-pressure steam and condensate line, moving/replacing/relocating steam vaults, and replacement of main water line connections in several residence halls. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pool piping replacement project.
Posted Date
Jan 19, 2026
Due Date
Feb 26, 2026
Release: Jan 19, 2026
Close: Feb 26, 2026
Pool piping replacement project.
AvailableWork includes installing approximately 300 feet of a new bored-in steam condensate line between existing steam vaults, installing approximately 80 feet of direct-bury steam condensate pipe, performing condensate pipe welding, building and vault core drills and patching, removing and replacing sidewalks, and excavation and backfill.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Close: Feb 10, 2026
Work includes installing approximately 300 feet of a new bored-in steam condensate line between existing steam vaults, installing approximately 80 feet of direct-bury steam condensate pipe, performing condensate pipe welding, building and vault core drills and patching, removing and replacing sidewalks, and excavation and backfill.
AvailableThe project includes replacement and modifications to existing steam distribution systems. This associated infrastructure includes primary steam piping, steam condensate return piping, condensate pump systems and distribution accessories. Additionally, the project includes phased construction sequencing to minimize impacts to critical facility operations
Posted Date
Dec 20, 2025
Due Date
Jan 30, 2026
Release: Dec 20, 2025
The project includes replacement and modifications to existing steam distribution systems. This associated infrastructure includes primary steam piping, steam condensate return piping, condensate pump systems and distribution accessories. Additionally, the project includes phased construction sequencing to minimize impacts to critical facility operations
The Town of Huntington, through the Pioneer Valley Planning Commission (PVPC), is soliciting qualifications for professional engineering design services for water main replacement, sewer replacement, road reconstruction, storm drainage, and sidewalk reconstruction on Blandford Hill Road. The project is funded by FY25 Massachusetts Executive Office of Housing and Livable Communities, CDBG program and PVPC is issuing this RFQ on behalf of the Town. The RFQ was posted 2026-01-21 and responses are due 2026-02-11; interested proposers are instructed to request an electronic copy of the RFQ from Sue Ortiz (sortiz@pvpc.org) if a public file is not provided.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
The Town of Huntington, through the Pioneer Valley Planning Commission (PVPC), is soliciting qualifications for professional engineering design services for water main replacement, sewer replacement, road reconstruction, storm drainage, and sidewalk reconstruction on Blandford Hill Road. The project is funded by FY25 Massachusetts Executive Office of Housing and Livable Communities, CDBG program and PVPC is issuing this RFQ on behalf of the Town. The RFQ was posted 2026-01-21 and responses are due 2026-02-11; interested proposers are instructed to request an electronic copy of the RFQ from Sue Ortiz (sortiz@pvpc.org) if a public file is not provided.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis