CityOH
Posted
-
Oct 8, 2026
Water and Sanitary Sewer Relocation and Manhole Reconstruction within Storm Sewer Limits
The City of Findlay is seeking a construction contract to remove an existing 12-inch water line and 15-inch sanitary sewer line from an existing 36-inch storm sewer. Work includes lowering the water line by about five feet, lowering and replacing the sewer manholes, installing about 408 linear feet of new 18-inch sanitary sewer beneath the storm sewer, and reconnecting existing lines. The project is locally funded and also includes traffic control, excavation, disposal, pavement restoration, and compliance with Ohio prevailing-wage, equal-employment, and domestic-steel requirements.
