School DistrictMT
Posted
Oct 21, 2026
Jan 9, 2027
DISTRICT TRACK PROJECT RFP
Construction of Phase I of the Troy School District track, including removal of the existing track and grading and paving the new track.
Description: Project consists of track rehabilitation & construction.
Other · PA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictMT
Posted
Oct 21, 2026
Jan 9, 2027
Construction of Phase I of the Troy School District track, including removal of the existing track and grading and paving the new track.
CityOH
Posted
Nov 3, 2026
Nov 19, 2026
Work includes sewer preparation: light cleaning, trimming of protruding service laterals, and operations & inspection: lateral reinstatement, sewer videotaping and inspection, and sewage pumping.
CityMI
Posted
Nov 6, 2026
Dec 14, 2026
Work includes 400 SY concrete pavement, remove; 175 SF concrete drive and sidewalk, remove; 550 SY bituminous pavement, remove; 100 LF concrete curb and gutter, remove; 6 EA fire hydrant, remove; 4 EA gate valve and well remove; 4 EA sign, salvage; 6,300 LF water main, 8" hdpe, directional drill; 80 LF water main, 8" hdpe, pipe burst ex 6"; 13 EA gate valve and well, 8"; 32 CY water main, abandon with flowable fill; 73 EA water service, hdpe, 1", long. See attached file.
Kenton County Airport Board, Contract & Procurement Administration
Special DistrictKY
Posted
Nov 12, 2026
Dec 17, 2026
Police Department Rehabilitation Project includes replacing HVAC equipment, modifying fire protection systems, upgrading electrical systems, installing perimeter fencing and two vehicle gate operators, and improving finishes in the patrol room, first-floor restrooms, and IT server room. It also includes allowances for above-ceiling wiring cleanup, temporary restroom maintenance or service.