Alhambra Water Main Rehabilitation RFP
Work consists of installation of 925 linear feet of PVC C900 water pipe by open cut and the rehabilitation of approx 7,635 linear feet of existing 16" diameter steel water transmission main with Flexible Fabric Reinforced Pipe. The Work includes preliminary evaluation of existing infrastructure, construction of access pits necessary for lining activities, and replacement of fitting, valve or other appurtenances and lining of existing transmission main. The pipeline is a key transmission asset and the corridor presents constrained working widths, roadway curvature, and traffic control constraints.