Route 9 Water Main Rehabilitation - Phase I RFP

Description: Work includes approx 270 LF of 8" Ductile Iron pipe, furnished and installed; 950 LF of pre-lining CCTV water main inspection; 950 LF of fully structural water main CIPP lining Hot Water Circulation or Steam Curing, furnished and installed; 950 LF of post-lining CCTV water main inspection; furnishing, installing, maintaining, and removing temporary bypass piping; safe removal and legal disposal of demolished Asbestos Concrete pipe and asbestos-containing material; replacement of gate valves and hydrant assemblies; pressure testing, disinfection, and restoration of all disturbed pavement and surfaces.

Buyer
Town of Westborough

City · MA, US

Released
Jul 1, 2026
Closes
Nov 19, 2026(14 days left)