CityMA
Posted
Oct 1, 2026
Oct 29, 2026
2026 Water Main Rehabilitation at Various Locations RFP
Work includes construction of approx. 8,830 LF of 8-inch diameter and approx. 610 LF of 6-inch diameter ductile iron water main including associated valves, fittings, hydrants, water services, and temporary bypass piping. Description: 1 LS of mobilization & demobilization; 10125 LF of sawcut bituminous concrete roadways; 300 LF of sawcut reinforced concrete roadways; general excavation; 75 CY of test pits; 40 CY of excavation below grade; 40 CY of rock removal; 675 ton of gravel borrow; 525 ton of dense graded crushed stone; 150 ton of sand for water service pipe bedding; 25 ton of 3/4" fractured crushed stone; 40 CY of controlled density fill; 190 CY of class b cement concrete for encasement; 1500 lb of dust control (chemical treatment). See attached file.