Open RFP

Alhambra Water Main Rehabilitation RFP

Description: Work consists of installation of 925 linear feet of PVC C900 water pipe by open cut and the rehabilitation of approx 7,635 linear feet of existing 16" diameter steel water transmission main with Flexible Fabric Reinforced Pipe. The Work includes preliminary evaluation of existing infrastructure, construction of access pits necessary for lining activities, and replacement of fitting, valve or other appurtenances and lining of existing transmission main. The pipeline is a key transmission asset and the corridor presents constrained working widths, roadway curvature, and traffic control constraints.

Buyer
City of Martinez

City · CA, US

Released
Oct 22, 2026
Closes
Nov 19, 2026(24 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts