Closing soon

Tolono Village - Downtown Plaza improvements RFP

Description: Work includes 100 LF of Combination Curb and Gutter Removal; 860 SF of PCC Pavement Removal; 560 CY of Earth Excavation and Disposal; 4 EA of Inlet Protection; 212 TONS of CA-6, Compacted at Depths Specified; 196 TONS of CA-7, Compacted; 288 LF of Pavement Marking, 4"; 25 SF of Pavement Markings and Symbols; 2,520 SF of 5" PCC Pavement; 3,000 SF of 6" PCC Pavement; 52 LF of 6" Ribbon Curb; 4,006 SF of Artificial Turf Installation, Complete; 100 LF of Concrete Curb & Gutter; 45 SF of Detectable Warning; 206 LF of 4" Perforated SDR 35 PVC, Installed, Complete; 50 LF of 6" SDR35 Perforated PVC, Installed, Complete; 123 LF of 12" RCP Storm Sewer, Installed, Complete; 1 EA of 6" Sanitary Tap and Cleanout; 45 LF of 6" SDR 26 Sanitary Service; 1 LSUM of 1" Water Service and Pressure Tap, Complete; 45 LF of 1" Copper Water Service, Type-K, Installed, Complete; 1 EA of 1" Brass Corporation Valve and B-Box; 2 EA of 48" Concrete Manhole; 220 LF of Electrical Conduit, 3", Installed, Complete; 6 EA of 13in x 24in Utility Junction Box, Complete; 6 LSUM of Catenary Light Poles, Installed, Complete; 44 CY of Concrete Wall and Ramp Structure; 59 CY of Cast-in-Place Concrete Retaining Wall; 87 LF of Guard Rail without handrail; 149 LF of Guard Rail with handrail; 1 EA of Fire Pit Pad, 1" gas supply and lockable shut-off valve; 1 LSUM of Bonds; 1 LSUM of Insurance; and 1 LSUM of Mobilization.

Buyer
Village of Tolono

City · IL, US

Released
Aug 5, 2026
Closes
Aug 17, 2026(5 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts