CityNY
Jul 17, 2026
Closes
Aug 7, 2026
Village Hall HVAC Renovation Project RFP
Project includes replacement of five existing packaged rooftop units. Three of the rooftop units are VAV, DX cooling-only units, and two of the rooftop units are heating (natural gas) and DX cooling CAV units. Furthermore, this project requires the replacement of an estimated twenty-three VAV boxes with hot water coils. The contractor shall verify if additional existing VAV boxes are found once ceilings are removed. An existing five-ton DX split system for the gym and associated hot water coil shall also be replaced. Lastly, a new building management system for control of equipment must be installed.