Tolono Village - Downtown Plaza improvements
Aug 5, 2026
Closes
Aug 17, 2026
Work includes 100 LF of Combination Curb and Gutter Removal; 860 SF of PCC Pavement Removal; 560 CY of Earth Excavation and Disposal; 4 EA of Inlet Protection; 212 TONS of CA-6, Compacted at Depths Specified; 196 TONS of CA-7, Compacted; 288 LF of Pavement Marking, 4"; 25 SF of Pavement Markings and Symbols; 2,520 SF of 5" PCC Pavement; 3,000 SF of 6" PCC Pavement; 52 LF of 6" Ribbon Curb; 4,006 SF of Artificial Turf Installation, Complete; 100 LF of Concrete Curb & Gutter; 45 SF of Detectable Warning; 206 LF of 4" Perforated SDR 35 PVC, Installed, Complete; 50 LF of 6" SDR35 Perforated PVC, Installed, Complete; 123 LF of 12" RCP Storm Sewer, Installed, Complete; 1 EA of 6" Sanitary Tap and Cleanout; 45 LF of 6" SDR 26 Sanitary Service; 1 LSUM of 1" Water Service and Pressure Tap, Complete; 45 LF of 1" Copper Water Service, Type-K, Installed, Complete; 1 EA of 1" Brass Corporation Valve and B-Box; 2 EA of 48" Concrete Manhole; 220 LF of Electrical Conduit, 3", Installed, Complete; 6 EA of 13in x 24in Utility Junction Box, Complete; 6 LSUM of Catenary Light Poles, Installed, Complete; 44 CY of Concrete Wall and Ramp Structure; 59 CY of Cast-in-Place Concrete Retaining Wall; 87 LF of Guard Rail without handrail; 149 LF of Guard Rail with handrail; 1 EA of Fire Pit Pad, 1" gas supply and lockable shut-off valve; 1 LSUM of Bonds; 1 LSUM of Insurance; and 1 LSUM of Mobilization.
