Open RFP

Tokio & Wood Lake Sewer Collection and Treatment

Description: Construction of a community collection system, new community fiberglass lift station, sewage treatment area, holding pond renovations, 1,906' of 2" HDPE DR 11 sewer force main, 18 standard manholes, 1 shallow manholes, 1 drop manholes, 3,682' of 8" PVC SDR 35 sewer main pipe, 756' of 8" cured-in-place-pipe, 620 feet of 4" PVC SDR 35 sewer service line pipe, 24 sewer saddles, 12 lateral reinstatements, 6 septic tank abandonments, 157 cy of road restoration (gravel), 784 SY of road restoration (asphalt), packaged trickling filter system, dual 15,000 gallon septic tanks (one with pumping), backup generator, distribution splitter manhole, existing lagoon renovations to shape into new holding ponds for the treatment system, 4,762 CY excavation, metering manhole and all other incidents to complete the work as stated in the specifications.

Buyer
Spirit Lake Tribe

IndigenousGovernment · ND, US

Released
Aug 28, 2026
Closes
Sep 30, 2026(27 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts