Tokio & Wood Lake Sewer Collection and Treatment
Posted
Aug 28, 2026
Sep 30, 2026
Construction of a community collection system, new community fiberglass lift station, sewage treatment area, holding pond renovations, 1,906' of 2" HDPE DR 11 sewer force main, 18 standard manholes, 1 shallow manholes, 1 drop manholes, 3,682' of 8" PVC SDR 35 sewer main pipe, 756' of 8" cured-in-place-pipe, 620 feet of 4" PVC SDR 35 sewer service line pipe, 24 sewer saddles, 12 lateral reinstatements, 6 septic tank abandonments, 157 cy of road restoration (gravel), 784 SY of road restoration (asphalt), packaged trickling filter system, dual 15,000 gallon septic tanks (one with pumping), backup generator, distribution splitter manhole, existing lagoon renovations to shape into new holding ponds for the treatment system, 4,762 CY excavation, metering manhole and all other incidents to complete the work as stated in the specifications.