Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide services for permitting and dredging of two (2) ponds.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes dredging, regrading, and placement of ripap on stormwater ponds with the following quantities: 1285 CY - pond dredging, 1905 ton - riprap placement, 5 ton - 3/4" crushed stone placement misc. Erosion control and landscaping.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
Project includes dredging, regrading, and placement of ripap on stormwater ponds with the following quantities: 1285 CY - pond dredging, 1905 ton - riprap placement, 5 ton - 3/4" crushed stone placement misc. Erosion control and landscaping.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will involve removing, hauling, and disposing of accumulated sediment from the pond, installing two (2) forebays at existing inflows to the pond, and installing one (1) aquatic bench with breaks for public use. The project will also include the replacement of existing asphalt trails, if any, destroyed by the project, restoring the site, and implementing landscaping.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
The project will involve removing, hauling, and disposing of accumulated sediment from the pond, installing two (2) forebays at existing inflows to the pond, and installing one (1) aquatic bench with breaks for public use. The project will also include the replacement of existing asphalt trails, if any, destroyed by the project, restoring the site, and implementing landscaping.
AvailablePark renovations including playground equipment replacement and new rubberized safety surfacing, new park shelter, concrete flatwork and trail, site furnishings, landscaping and electrical. Add Alternate includes remodel of existing park restroom building.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Park renovations including playground equipment replacement and new rubberized safety surfacing, new park shelter, concrete flatwork and trail, site furnishings, landscaping and electrical. Add Alternate includes remodel of existing park restroom building.
AvailableProvide commercial lawn, park and golf course equipment, open-end.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Provide commercial lawn, park and golf course equipment, open-end.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →