Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of a qualified General Contractor for the removal of 10,000 Cubic Yards of accumulated sediment and the installation of two forebays and one aquatic bench on Willow Lake.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes dredging, regrading, and placement of ripap on stormwater ponds with the following quantities: 1285 CY - pond dredging, 1905 ton - riprap placement, 5 ton - 3/4" crushed stone placement misc. Erosion control and landscaping.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
Project includes dredging, regrading, and placement of ripap on stormwater ponds with the following quantities: 1285 CY - pond dredging, 1905 ton - riprap placement, 5 ton - 3/4" crushed stone placement misc. Erosion control and landscaping.
AvailablePremium
Access the largest public sector contact database
Project will involve the dredging of one stormwater pond to remove and properly dispose of accumulated regulated sediment, and the necessary work needed to compliantly access, dredge, provide erosion control, and restore the pond and adjacent areas including impacts to private landowners.
Posted Date
Dec 4, 2025
Due Date
Dec 29, 2025
Release: Dec 4, 2025
Close: Dec 29, 2025
Project will involve the dredging of one stormwater pond to remove and properly dispose of accumulated regulated sediment, and the necessary work needed to compliantly access, dredge, provide erosion control, and restore the pond and adjacent areas including impacts to private landowners.
AvailableProject will involve the dredging of one stormwater pond to remove and properly dispose of accumulated regulated sediment, and the necessary work needed to compliantly access, dredge, provide erosion control, and restore the pond and adjacent areas including impacts to private landowners.
Posted Date
Dec 4, 2025
Due Date
Dec 29, 2025
Release: Dec 4, 2025
Close: Dec 29, 2025
Project will involve the dredging of one stormwater pond to remove and properly dispose of accumulated regulated sediment, and the necessary work needed to compliantly access, dredge, provide erosion control, and restore the pond and adjacent areas including impacts to private landowners.
AvailableThe project will consist of dredging and maintaining existing wastewater storage lagoons to restore capacity for use as equalization. The bio-solids quantities that can be removed have been estimated to be as follows: east pond: 712,166 gallons; 5.1% solids for 156 tons dry weight west pond: 1,019,152 gallons; 5.3% solids for 232 tons dry weight additional information and details of sampling is found in appendix A of the bidding package.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
The project will consist of dredging and maintaining existing wastewater storage lagoons to restore capacity for use as equalization. The bio-solids quantities that can be removed have been estimated to be as follows: east pond: 712,166 gallons; 5.1% solids for 156 tons dry weight west pond: 1,019,152 gallons; 5.3% solids for 232 tons dry weight additional information and details of sampling is found in appendix A of the bidding package.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis