Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes dredging, regrading, and placement of ripap on stormwater ponds with the following quantities: 1285 CY - pond dredging, 1905 ton - riprap placement, 5 ton - 3/4" crushed stone placement misc. Erosion control and landscaping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pond dredging.
Posted Date
Dec 12, 2024
Due Date
Feb 5, 2026
Release: Dec 12, 2024
Close: Feb 5, 2026
Pond dredging.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Port of Portland is soliciting bids for maintenance dredging at Terminal 4 (Berths 410-411) to achieve a minimum design elevation of -42 ft CRD with maximum pay elevation -43 ft CRD and maximum dredging depth -44 ft CRD; dredged material must be transported to a Port-approved landfill, capped with sand, and large woody debris placed at an upland mitigation site on West Hayden Island. The solicitation is a lump-sum construction services bid posted 2026-01-14 and is due 2026-02-19, with an estimated bid value shown as $3,000,000. The posting lists pre-bid and Q&A dates and contact information for the Port (Brandon Alius); the opportunity is in the Bidding stage and not a grant.
Posted Date
Jan 14, 2026
Due Date
Feb 19, 2026
Release: Jan 14, 2026
Close: Feb 19, 2026
The Port of Portland is soliciting bids for maintenance dredging at Terminal 4 (Berths 410-411) to achieve a minimum design elevation of -42 ft CRD with maximum pay elevation -43 ft CRD and maximum dredging depth -44 ft CRD; dredged material must be transported to a Port-approved landfill, capped with sand, and large woody debris placed at an upland mitigation site on West Hayden Island. The solicitation is a lump-sum construction services bid posted 2026-01-14 and is due 2026-02-19, with an estimated bid value shown as $3,000,000. The posting lists pre-bid and Q&A dates and contact information for the Port (Brandon Alius); the opportunity is in the Bidding stage and not a grant.
AvailableDredging and relocation of lake bottom sand within the required area.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Dredging and relocation of lake bottom sand within the required area.
AvailableThe City of Columbus, Recreation and Parks Department requests quotes for pond management services at six park ponds, including bi-weekly evaluations, eco-friendly chemical treatments, water quality testing, application of MuckBiotic probiotic bacteria, debris removal, and bi-weekly reporting. The contract work runs approximately seven months (evaluations beginning 4/1/2026 through 10/28/2026) and the total estimated contract value is $13,000. Vendors must visit the buyer’s official posting for full documentation and response instructions.
Posted Date
Jan 15, 2026
Due Date
Feb 9, 2026
Release: Jan 15, 2026
Close: Feb 9, 2026
The City of Columbus, Recreation and Parks Department requests quotes for pond management services at six park ponds, including bi-weekly evaluations, eco-friendly chemical treatments, water quality testing, application of MuckBiotic probiotic bacteria, debris removal, and bi-weekly reporting. The contract work runs approximately seven months (evaluations beginning 4/1/2026 through 10/28/2026) and the total estimated contract value is $13,000. Vendors must visit the buyer’s official posting for full documentation and response instructions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →