Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Park renovations including playground equipment replacement and new rubberized safety surfacing, new park shelter, concrete flatwork and trail, site furnishings, landscaping and electrical. Add Alternate includes remodel of existing park restroom building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project will include but not limited to: asphalt access trails paving, sidewalk removal and replacement, concrete curb installation, fence installation, construction of pickleball courts and color coat, retaining wall, nature play area (play equipment by others) with concrete walk to shelter (shelter construction by others), restoration and other items needed to complete the proposed improvements.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Close: Dec 19, 2025
Project will include but not limited to: asphalt access trails paving, sidewalk removal and replacement, concrete curb installation, fence installation, construction of pickleball courts and color coat, retaining wall, nature play area (play equipment by others) with concrete walk to shelter (shelter construction by others), restoration and other items needed to complete the proposed improvements.
Premium
Access the largest public sector contact database
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
AvailableOutdoor recreation park additions improvements.
Posted Date
Nov 12, 2025
Due Date
Jan 5, 2026
Release: Nov 12, 2025
Close: Jan 5, 2026
Outdoor recreation park additions improvements.
AvailableConstruction of the Asset Renewal Project Phase 2, Baldwinsville-Seneca Knolls Wastewater Treatment Plant Contract No. 2A - General Construction, Contract No. 2B Electrical Construction, and Contract No. 2C Heating and Ventilating Construction. The project generally consists of: Process Drain and Influent Sampler Relocation Primary Sludge Degritter Replacement RAS and WAS Flow Metering Upgrades Replacement of Aeration Purge Blowers Replacement of Belt Filter Presses and Upgrades to Sludge Loadout Replacement of Process Water Pumps Slide Gate Replacements throughout the WWTP SCADA Upgrades throughout WWTP HVAC and Electrical Updates throughout WWTP Miscellaneous Concrete and Structural Repairs throughout WWTP Architectural Update to WWTP Building Site/Civil Improvements through WWTP.
Posted Date
Oct 23, 2025
Due Date
Dec 23, 2025
Release: Oct 23, 2025
Close: Dec 23, 2025
Construction of the Asset Renewal Project Phase 2, Baldwinsville-Seneca Knolls Wastewater Treatment Plant Contract No. 2A - General Construction, Contract No. 2B Electrical Construction, and Contract No. 2C Heating and Ventilating Construction. The project generally consists of: Process Drain and Influent Sampler Relocation Primary Sludge Degritter Replacement RAS and WAS Flow Metering Upgrades Replacement of Aeration Purge Blowers Replacement of Belt Filter Presses and Upgrades to Sludge Loadout Replacement of Process Water Pumps Slide Gate Replacements throughout the WWTP SCADA Upgrades throughout WWTP HVAC and Electrical Updates throughout WWTP Miscellaneous Concrete and Structural Repairs throughout WWTP Architectural Update to WWTP Building Site/Civil Improvements through WWTP.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis