Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of the Asset Renewal Project Phase 2, Baldwinsville-Seneca Knolls Wastewater Treatment Plant Contract No. 2A - General Construction, Contract No. 2B Electrical Construction, and Contract No. 2C Heating and Ventilating Construction. The project generally consists of: Process Drain and Influent Sampler Relocation Primary Sludge Degritter Replacement RAS and WAS Flow Metering Upgrades Replacement of Aeration Purge Blowers Replacement of Belt Filter Presses and Upgrades to Sludge Loadout Replacement of Process Water Pumps Slide Gate Replacements throughout the WWTP SCADA Upgrades throughout WWTP HVAC and Electrical Updates throughout WWTP Miscellaneous Concrete and Structural Repairs throughout WWTP Architectural Update to WWTP Building Site/Civil Improvements through WWTP.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
AvailableConstruction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
Posted Date
Dec 26, 2025
Due Date
Jan 22, 2026
Release: Dec 26, 2025
Close: Jan 22, 2026
Construction of the wastewater treatment plant no. 1 - Phase 1 (0.15 MGD).
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableProject consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
Project consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis