CityNC
Apr 29, 2026
Closes
Aug 6, 2026
Collective Storm Drainage Improvement Project - Series W RFP
The Collective Storm Drainage Improvement Project Series W will include 2 separate projects with this series. 10208 and 10209 Drive will include 207 LF of new 48" RCP that will connect an existing upstream creek channel to Providence Lake. The 48" RCP installation will be approx. 7-14 FT deep and foundation protection approved by a professional engineer is anticipated. 10208 and 10209 Drive anticipates foundation protection at 10201 and 10209 Drive. 7211 Quail Meadow Lane will include 717 LF of new 42" RCP, 60 LF of new 38" x 60" elliptical RCP, and 19 LF of new 15" RCP.