CityNC
Posted
Oct 28, 2026
Dec 3, 2026
Collective Storm Drainage Improvement Project - Series AJ RFP
Work include approx 60 LF of 24" rcp; 28 LF of 24" CIPP; 120 LF of 18" RCP; 143 LF of 24" RCP; 343 SY 0.0"-3.0" milling ashpalt pavement.
Description: Work includes rehabilitation of an existing 60 LF 8' x 6' RCBC, including addressing exposed rebar, concrete elamination, and vegetation removal, remove and replace approx 234 LF of 15" RCP, water and sewer relocations, remove and replace approx 102 LF of 18" RCP, sewer relocation, install storm drainage infrastructure, install approx 358 LF of 18" RCP, 36 LF of 24" RCP, and 10 structures, approx 500 LF of curb and gutter will be installed, two sewer relocations will be required.
City · NC, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityNC
Posted
Oct 28, 2026
Dec 3, 2026
Work include approx 60 LF of 24" rcp; 28 LF of 24" CIPP; 120 LF of 18" RCP; 143 LF of 24" RCP; 343 SY 0.0"-3.0" milling ashpalt pavement.
CityNC
Posted
Oct 15, 2027
Dec 31, 2027
The Piccadilly Storm Drainage Improvement Project aims to improve storm drainage infrastructure, including pipe systems and culverts, to reduce flooding. The project also focuses on enhancing degraded stream reaches to reduce erosion and improve water quality within the designated area. It is currently listed as an upcoming construction project for Charlotte Storm Water Services with an anticipated posting date in late 2027.
CityNC
Posted
Feb 1, 2027
Feb 1, 2027
The Hidden Valley Storm Drainage Improvement Project involves the assessment, design, and construction of stormwater conveyance improvements to address flooding at 18 structures and 7 road sections. The project area is bounded by I-85, Cinderella Road, Echo Glen Road, and West Sugar Creek Road. The City of Charlotte requires contractors to provide various insurance coverages and construction bonds, including bid, payment, and performance bonds.
CityNC
Posted
Aug 15, 2027
Dec 31, 2027
The City of Charlotte is soliciting construction bids for the Hill Street Storm Drainage Improvement Project to mitigate flooding and repair failing storm drainage infrastructure within a defined project boundary. The procurement is an Invitation for Bid with an estimated total project value of $1,000,000–$4,999,999 and a one-year contract term. The solicitation is listed as Upcoming with an anticipated posting date of 2027-08-15 and no close date specified yet.