Collective Storm Drainage Improvement Project - Series AD RFP
Work includes rehabilitation of an existing 60 LF 8' x 6' RCBC, including addressing exposed rebar, concrete elamination, and vegetation removal, remove and replace approx 234 LF of 15" RCP, water and sewer relocations, remove and replace approx 102 LF of 18" RCP, sewer relocation, install storm drainage infrastructure, install approx 358 LF of 18" RCP, 36 LF of 24" RCP, and 10 structures, approx 500 LF of curb and gutter will be installed, two sewer relocations will be required.