Se 1st Street / Se Anchor Avenue Storm Drainage Project RFP
Jul 31, 2026
Closes
Aug 20, 2026
The Work consists of storm drainage improvements along SE 1st Street, including utility potholing; removal, abandonment, and replacement of existing storm drainage facilities; installation of storm pipe, catch basins, structures, and connections to existing facilities; storm-flow bypass and dewatering; handling, testing, and disposal of potentially contaminated material; traffic control; erosion control; roadway and surface restoration; and related work.