Bloom-Carroll Local School District
School DistrictOH
Aug 24, 2026
Closes
Sep 10, 2026
Bloom-Carroll Storage Building
Construction of Storage Building.
Description: The U.S. Army's Mission Installation Contracting Command at Fort Drum is soliciting offers for a climate-controlled storage building at Fort Campbell, Kentucky. This is a total small business set-aside procurement under NAICS 332311 for prefabricated metal building and component manufacturing. Offers are due September 2, 2026, at 10:30 a.m. CDT, and the opportunity is an active Combined Synopsis/Solicitation rather than a grant program.
Federal · NY, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from W6QM Micc-Ft DRUM.
Adjacent opportunities open for bidding right now.
Bloom-Carroll Local School District
School DistrictOH
Aug 24, 2026
Closes
Sep 10, 2026
Construction of Storage Building.
CityNC
Aug 14, 2026
Closes
Sep 4, 2026
The Town of Seven Devils is accepting sealed bids from North Carolina licensed general contractors to construct a new Municipal Salt Storage Building at 185 Chinkapin Ridge Road in Seven Devils, NC. Project #264007 includes an approximately 80' × 30' storage building, a 30' × 30' concrete loading pad, site preparation, permits, labor, materials, equipment, and related work. Two signed hard copies are due September 4, 2026, at 12:00 PM, and the posting describes a construction invitation to bid rather than a grant program.
CityMO
Feb 25, 2026
Closes
Oct 1, 2026
Work includes construction of a 14'-0" x 20'-0" storage building. ; demo and dispose of existing asphalt paving, as required, for new structure; earth excavation and grubbing, as required, for the new structure. All excess material to be disposed of off-site by contractor; excavate and pour for assumed 2'-0" x 2'-0" continuous grade beam footings at perimeter; form and pour 8" thick continuous concrete stem wall at south and west building walls and south & east dumpster walls, (height to vary based on final elevations); membrane water proofing to be applied at all concrete stem walls;form and pour 4" 3500-psi, welded-wire fabric reinforced concrete slab-on-grade, troweled finish at building, broom finished at dumpster area. See attached file.
CityCT
Aug 28, 2026
Closes
Sep 17, 2026
The City of Waterbury is soliciting sealed bids for the procurement and installation of a modular garage storage building at the North End Recreation Center. Bidders may propose either a 24-foot-wide by 36-foot-deep building or a 24-foot-wide by 24-foot-deep double-bay building, with an alternate price for preparing and installing a three-quarter-inch crushed-stone base. The solicitation is an open ITB, and bids must be publicly opened and read aloud after delivery to the Director of Purchasing by 11:30 a.m. on September 17, 2026.