Senior Center Storage Building

Description: Work includes construction of a 14'-0" x 20'-0" storage building. ; demo and dispose of existing asphalt paving, as required, for new structure; earth excavation and grubbing, as required, for the new structure. All excess material to be disposed of off-site by contractor; excavate and pour for assumed 2'-0" x 2'-0" continuous grade beam footings at perimeter; form and pour 8" thick continuous concrete stem wall at south and west building walls and south & east dumpster walls, (height to vary based on final elevations); membrane water proofing to be applied at all concrete stem walls;form and pour 4" 3500-psi, welded-wire fabric reinforced concrete slab-on-grade, troweled finish at building, broom finished at dumpster area. See attached file.

Buyer
City of Neosho

City · MO, US

Released
Feb 25, 2026
Closes
Oct 1, 2026(30 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts