Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves replacing approx 700 LF of existing 4" iron water main with new 8" polyethylene encased ductile iron water main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 29, 2026
Release: Dec 3, 2025
Close: Jan 29, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of water main replacement.
Posted Date
Dec 7, 2025
Due Date
Feb 13, 2026
Release: Dec 7, 2025
Close: Feb 13, 2026
Project consists of water main replacement.
AvailableWater main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
AvailableReplacement of approx. 3,000 LF of water main. The new water main will replace the existing cast iron main. This water main replacement includes replacement of associated valves, hydrants and service lines. Replacement will start at DeLorme Drive and extend north on Route 1 to the Cousins River bridge. The existing cast iron water mains on Route 1 will be abandoned in place. The materials furnished by Owner are indicated in the contract documents. The Contractor shall install materials furnished by the Owner. The project is in advance of proposed work by MaineDOT to extend the Beth Condon walking trail on the southerly shoulder of Route 1. The base bid is designed around replacement of water main via open cut installation. A bid alternate is included for water main installation via horizontal directional drill.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Replacement of approx. 3,000 LF of water main. The new water main will replace the existing cast iron main. This water main replacement includes replacement of associated valves, hydrants and service lines. Replacement will start at DeLorme Drive and extend north on Route 1 to the Cousins River bridge. The existing cast iron water mains on Route 1 will be abandoned in place. The materials furnished by Owner are indicated in the contract documents. The Contractor shall install materials furnished by the Owner. The project is in advance of proposed work by MaineDOT to extend the Beth Condon walking trail on the southerly shoulder of Route 1. The base bid is designed around replacement of water main via open cut installation. A bid alternate is included for water main installation via horizontal directional drill.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →