Description: DESIGN-BUILD: Project will enable charging of washington state ferries hybrid electric vessels at colman dock slips #1 and #3. The design build contractor will work closely and collaboratively with the systems integrator, washington state ferries, vessel charging system (vcs) supplier, and seattle city light (scl) to construct a complete system through the following project components. Installation of two submarine cables via directionally drilled conduits and seafloor surface lay between pier 48 and Colman Dock.