CityMO
Posted
Sep 4, 2026
Oct 13, 2026
N Main St Sewer Extension
Work includes the construction of a 269 LF 8" PVC sanitary gravity sewer extension along street, including four precast manholes. The sewer extension will tie into the existing city gravity sanitary sewer line at the intersection through the use of a doghouse manhole. See outside link.