Government Center Demolition RFP
Work includes approx 1 LS demolition of existing buildings.
Description: Work consists of the demolition and removal of the abandoned digester, filling of excavation, restoration of the site, ancillary landscaping and 180' of installation of security fencing, 135' of tree protective fencing, 1 ea of tree removal and replacement, concrete pavement removal.
City · IL, US
Decision makers connected to this RFP from City of Naperville.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyMN
Posted
-
Nov 12, 2026
Work includes approx 1 LS demolition of existing buildings.
CountyHI
Posted
Oct 16, 2026
Nov 19, 2026
This project generally consists of the demolition of the existing community center.
Division of Facilities Management
State AgencyDE
Posted
Oct 21, 2026
Nov 23, 2026
The project generally consists of the complete demolition and removal of nine (9) existing buildings at the former Plummer Community Corrections Center, including all associated building foundations, footings, concrete slabs, and below-grade building construction. All demolition debris shall be removed from the site and disposed of in accordance with applicable regulations. Existing site utilities shall be disconnected, cut, and permanently capped at or immediately adjacent to each building. Existing site utility distribution systems shall remain in place. All existing site improvements, including asphalt paving, roadways, parking areas, sidewalks, curbing, and perimeter fencing, shall remain and be protected throughout demolition activities. Following demolition, building excavations shall be backfilled and rough graded to provide safe, stable, and properly draining conditions. Comprehensive site grading, paving replacement, landscaping, and site redevelopment are not included in the project scope. Hazardous and regulated material abatement will be completed by others prior to demolition.
Higher EducationOK
Posted
Oct 26, 2026
Nov 17, 2026
Various trade packages for the demolition of the center. Project induces demolition of the existing STEM Center building, associated parking areas and drives as indicated, and grading of the site to provide proper drainage and sod stabilization of all disturbed areas.